ULICE
Union of Light Ion Centres in Europe |
Coordinator: CNAO, Italy CERN Contact: Manjit Dosanjh EU funding: 8.4 M€ over 4 years 1 September 2009 - 31 August 2013 |
Union of Light Ion Centres in Europe |
Coordinator: CNAO, Italy CERN Contact: Manjit Dosanjh EU funding: 8.4 M€ over 4 years 1 September 2009 - 31 August 2013 |
Test Infrastructure and Accelerator Research Area |
Coordinator: CEA, France CERN Contact: Steve Myers EU funding: 3.9 M€ over 3 years 1 January 2011 - 31 December 2013 |
Preparatory Phase of the Large Hadron Collider upgrade |
Coordinator: CERN, Switzerland CERN Contact: Roland Garoby EU funding: 5.2 M€ over 3 years 1 April 2008 - 30 March 2011 |
Design of a pan-European Infrastructure for Large Apparatus studying Grand Unification, Neutrino Astrophysics and Long Baseline Neutrino Oscillations |
Coordinator: ETHZ, Switzerland CERN Contact: Ilias Eftymiopoulos EU funding: 4.9 M€ over 3 years 1 September 2011 - 31 August 2014 |
International Linear Collider and High Gradient Superconducting RF-Cavities |
Coordinator: DESY, Germany CERN Contact: Jean-Pierre Delahaye EU funding: 5 M€ over 4 years 1 February 2008 - 31 January 2012 |
International Coherent Amplification Network ICAN studies a novel laser concept for High Energy Particle acceleration, known as CAN for Coherent Amplification Network that would guarantee high peak power and high average powers while exhibiting high efficiency, >30%. The approach is based on fibre amplification. The proposed technical evaluation will be performed by combining the expertise, know-how, and knowledge of world leading experts coming from optical science, technology and industry, including femtosecond fibre optics, instrumental optics, astronomy, manufacturing, and marketing. |
Coordinator: CNRS, France CERN Contact: Jean-Pierre Koutchouk EU funding: 0.5 M€ over 18 months 1 October 2011 - 31 March 2013 |
FP7 High Luminosity Large Hadron Collider Design Study |
Coordinator: CERN, Switzerland CERN Contact: Lucio Rossi EU funding: 4.9 M€ over 4 years 1 November 2011 - 31 October 2015 |
High Intensity Neutrino Oscillation Facility in Europe |
Coordinator: RAL, United Kingdom CERN Contact: Ilias Efthymiopoulos EU funding: 4 M€ over 4 years 1 September 2008 - 31 August 2012 |
European High-performance Infrastructures in Turbulence |
Coordinator: Max-Plank, Germany CERN Contact: Olivier Pirotte EU funding: 7 M€ over 3 years 1 April 2013 - 30 March 2017 |
Enhanced European Coordination for Accelerator Research & Development |
Coordinator: CERN, Switzerland CERN Contact: Maurizio Vretenar EU funding: 8 M€ over 4 years 1 May 2013- 30 April 2017 |